Digital AC Portable Resistive Three-Phase Load Banks Lead times are currently less than 3 months! Three-phase model options range from small, portable, low-power units, to high-power, indoor & outdoor permanent ... Подробнее
Kingway 100KW Resistive Load Bank for emergency use A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal ... Подробнее
A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. During testing, adjustment, ... Подробнее